Spiorad na Mara Offshore Wind Farm (Continued)
The Scottish Association for Marine Science (SAMS) are scheduled to service 2 Passive Acoustic Monitoring Devices (PAMs) on behalf of Spiorad na Mara Ltd. The work is estimated to take place between the 13th – 14th August 2024 depending on weather conditions. Related Documents
-
Spiorad na Mara Offshore Wind Farm
Partrac Ltd. Has inspected and serviced the metocean equipment seabed mooring within the Spiorad naMara offshore wind farm site using the vessel Mar Fortune (Section 5) Related Documents
-
Deploy Acoustic Doppler Current Profiler – Loch Duart
Information for Notice to Mariners Full details can be viewed in the NtM SoH 24072024 Notice This notice is to inform that Loch Duart Ltd (LDL) aim to deploy one Acoustic Doppler Current Profiler (ADCP) in the Sound of Harris, approximately 135 m off the east coast of Lingay, at 40m depth, for the period of…
-
Spiorad na Mara Offshore Wind Farm
NtM Number NtM 002_v05 Spiorad na Mara Windfarm/Floating LiDAR and Wave Buoy Service and Seabed Mooring Recovery Full details can be viewed in the NtM Number NtM 002_v05 Notice Partrac Ltd. is scheduled to inspect a metocean equipment seabed mooring within the Spiorad na Mara offshore wind farm site using the vessel Mar Fortune (Section…
-
NTM Scottish Hydro Electric Power Distribution (SHEPD)-Skye to South Uist Marine Surveys
The purpose of this (NtM) is to outline that the working area for the survey vessel has increased due to the vessels turning requirements. Related Documents
-
NLB NTM – Duncansby Head – AIS
Mariners are advised that, on or about 8 AUGUST 2024, AIS will be transmitted as an Aid to Navigation (AtoN)from this station. Related Documents Duncansby Head – AIS
-
Notice to Mariners: Metocean and Floating LiDAR Buoy Deployment – Talisk Offshore Wind Project
This notice is to inform that Green Rebel, an behalf of Magnora Offshore Wind, aims to deploy one (1) Floating LiDAR System buoy and one (1) Directional Wave Rider buoy at the Talisk Offshore Wind site, approximately 30km north of the Isle of Lewis for a minimum period of 24-months. Weather dependant, deployment of both…
-
NTM 04 Re-Establishment of Permanent Light
With reference to NOTICE TO MARINERS No. 08 of 2022 (DATED 24 JUNE 2022), notice is given that, on orabout 21 JULY 2024, the permanent light at this station will be re-established with the undernotedcharacteristics: NTM 04 of 2024 With reference to NOTICE TO MARINERS No. 07 of 2022 (DATED 26 MAY 2022), notice is…
-
Metocean and Floating LiDAR Buoy Deployment – Talisk Offshore Wind Project
This notice is to inform that Green Rebel, an behalf of Magnora Offshore Wind, aims to deploy one (1) Floating LiDAR System buoy and one (1) Directional Wave Rider buoy at the Talisk Offshore Wind site, approximately 30km north of the Isle of Lewis for a minimum period of 24-months.Weather dependant, deployment of both buoys…
-
Notice to Mariners – Loch Erisort Marine Survey – Laxay to Kershader
Mariners are advised that all overwater geophysical surveys conducted by Aspect Land & Hydrographic Surveys Ltd (on behalf of SHEPD) within Loch Erisort, Isle of Lewis are now complete and the survey vessel has demobilised. For further information download the Notice to Mariners – Loch Erisort Marine Survey (Laxay to Kershader) document.