Battery Point Energy Storage Park (24/00155/PPDM)
Reference Number | 24/00155/PPDM |
Date registered as valid | 19 April 2024 |
Description of Development | Battery energy storage facility: comprising of 6no. banks of battery units; associated inverters, transformers and high voltage electricity substation. Siting of welfare unit and storage container for parts. Create site access, aggregate hardstanding, carparking area, 3m high palisade fencing and gates, and 4m high acoustic barrier. |
Address or description of location to which the development relates | Battery Point Energy Storage Park, Newton Street, Stornoway, Isle Of Lewis |
Co-ordinates | E 143 060 N 932 238 |
Applicant Name | Point and Sandwick Development |
Applicant Address | The Old School, Knock, Point, HS2 0BW |
Agent name | The Greenspan Agency |
Agent address | 6 Castle Street, Edinburgh, EH2 3AT |
Related Documents
- Application Form
- 01 Location Plan
- 02 Location Plan and Existing Site Layout with Aerial
- 03 Proposed Site Layout
- 04 Proposed Site Layout with Aerial
- 05 Existing Scottish Water Assets
- 06 Swept Path HGV
- 07 Swept Path Tipper
- 08 Swept Path Crane
- 09 Proposed Battery Module Elevations
- 10 Proposed Inverter Module Elevations
- 11 Proposed Transformer and Ring Main Unit
- 12 Proposed Substation Elevations
- 13 Proposed Substation Foundations
- 14 Proposed Site Office Elevations
- 15 Proposed Fence Plan and Elevations
- 16 Proposed Lighting and CCTV Plan
- 17 Proposed Spare Parts Container Elevations
- 18 Proposed Auxiliary Transformer
- 19 Planting and Landscaping Plan
- 20 Proposed Drainage Layout
- 21 SI Confirmed Locations of Scottish Water Pipework
- 22 SI Topographic Survey
- Pre-Application Consultation Report
- Design and Access Statement
- Noise Assessment