Issued by: Northland Power
Date of issue: 08/11/2024
Partrac Ltd was scheduled to inspect and service metocean equipment (available to download below) within the Spiorad na Mara offshore wind farm site using the vessel Waddenstroom.
The seabed equipment and wave buoys were removed at the Spiorad na Mara site, and now only one Floating LiDAR.
File attachments